← Case Studies
26-53573
RCEA RN79 — Site installation
Sector: VRD / Highway infrastructure·Buyer: DREAL Bourgogne-Franche-Comté
68
Tender Health Score
GO WITH CONDITIONS (THS-only)
NO GO (HV-04)
Final recommendation
LOW
Confidence
Context
Site installation for the RCEA RN79 2×2 widening between La Fourche and Col des Vaux. Modules, networks, maintenance, and environmental penalty matrix.
Analysis Summary
Tender Health Score 68/100 on partial DCE. Hard Veto HV-04 confirmed: RC absent despite sommaire reference. Genuine procedural blocker — not a false positive.
Hard Veto Outcome
HV-04 VALID — RC missing from PLACE DCE
Key Findings
- CCAP, CCTP, DQE/BPUF present — strong technical package
- RC listed in sommaire but absent from downloadable DCE
- 64-month installation + maintenance contract on active RCEA corridor
Lessons Learned
- HV-04 correctly blocks bid when mandatory RC is missing
- THS can be mid-range while veto override produces NO GO