NOXAR Methodology

Evidence-first methodology for analyzing public construction tenders.

Principles

  • Evidence firstevery score requires a document citation
  • Score justifiedrubric rows only, no discretionary points
  • No opinion without referenceunsourced claims are flagged
  • Reproducibility ±3 pointstwo analysts on the same DCE should align

Tender Health Score (0–100)

Evidence-backed composite score. Recommendation follows the THS band unless a Hard Veto applies.

RangeRecommendation
≥ 80GO
60–79GO WITH CONDITIONS
40–59HIGH CAUTION
< 40NO GO

Hard Veto Logic

Ten binary rules (HV-01 to HV-10). Any trigger → NO GO regardless of THS.

  • HV-04: RC, CCAP, or CCTP missing from acquired DCE
  • HV-06: Missing referenced contractual document (CCAP Art. 2/3)
  • HV-07: Schedule contradiction >8 weeks without explanation
  • HV-09: Submission deadline passed

All vetoes are audited before final recommendation. False positives require evidence review.

Confidence Labels

HIGH≥90% sub-criteria evidence-backed, 0 vetoes
MEDIUM<20% at zero, ≤2 ambiguities, no veto
LOWVetoes, unread files, or ≥3 ambiguities
BLOCKEDCannot compute THS

Evidence Layer

Each sub-criterion includes: score, factual DCE statement, and reference (filename — article — page).

Payment Terms
Score: 3/5 (3/5 pts)
Evidence: 50-day global payment period.
Reference: RC/reglement_consultation.pdf — §1.8 — page 4